Custom ADU Design-Build Services

Custom ADU Design-Build Services

Design an ADU around the property, the people who will use it, and the long-term role it should play. Builtech combines architecture, engineering, permitting, construction, and finish decisions in one custom design-build process.

California Custom ADUs Design Permitting Construction

Tell us your city, property type, and timeline. Well reply within one business day.

Tell us your city, property type, and timeline. Well reply within one business day.

100

+

Projects Completed

Projects Completed

15

+

Years of Experience

Years of Experience

3

CSLB Classifications
(A, B, and C-8)

CSLB Classifications
(A, B, and C-8)

2

California Offices
(San Jose & Walnut)

California Offices
(San Jose & Walnut)

As Featured In:

Conceptual detached ADU exterior illustrating a site-specific design approach.

IS A CUSTOM ADU RIGHT FOR YOU?

When Custom ADUs Are the Right Fit

A custom ADU is appropriate when the lot is unusual, the primary home has a distinctive architectural language, the household has accessibility or multigenerational needs, the owner wants a specialized construction method, or the project has demanding fire, hillside, tree, utility, or privacy constraints. Custom design focuses effort where it adds real value rather than changing finishes on a generic plan.

IDEAL FOR

Irregular, sloped, narrow, or highly constrained lots

Aging-in-place or accessibility-focused living

High-end guest houses or long-term family residences

ICF, steel, highly noncombustible, or 3D-printed construction

Architecture that should complement an existing custom home

FROM FEASIBILITY TO CLOSEOUT

Builtechs Integrated Custom ADU Process

The process is organized around setting the program and budget together, so the design responds to both aspiration and construction reality. Each stage has a defined decision, deliverable, and owner responsibility so design, permitting, pricing, and construction remain aligned.

01

Feasibility

Review the property, goals, ADU type, site constraints, utilities, access, budget, and schedule before committing to a design path.

02

Concept Design

Test placement, floor plan, massing, privacy, materials, and construction approach. Select a preferred concept and record unresolved questions.

03

Engineering + Permits

Coordinate architecture, structure, energy, utilities, fire, and site documents; submit a complete package and manage agency comments.

04

Preconstruction

Finalize scope, price, selections, permit conditions, utility tasks, schedule, long-lead materials, financing, and site logistics.

05

Construction + Inspections

Manage site work, structure, enclosure, systems, finishes, quality control, inspections, safety, communication, and changes.

06

Closeout

Complete final inspections, punch work, utilities, warranties, manuals, permit records, owner orientation, and project documentation.

PROPERTY FEASIBILITY

Property and Feasibility Review

Before design begins, Builtech evaluates the property as a complete system. The review identifies what appears feasible, what requires confirmation, and which decisions have the greatest effect on cost, schedule, and approval.

Conceptual site and massing study for a custom ADU.
Conceptual site and massing study for a custom ADU.

Household Goals

Plan for expected users and changing household needs over the next 10 to 20 years.

Household Goals

Plan for expected users and changing household needs over the next 10 to 20 years.

Site Conditions

Addressing the critical first five feet and near-home combustible reduction.

Site Conditions

Addressing the critical first five feet and near-home combustible reduction.

Privacy + Orientation

Navigating local permitting and strictly code-aware material selection.

Privacy + Orientation

Navigating local permitting and strictly code-aware material selection.

Utilities

Focusing on ember-resistant venting, roof-edge detailing, and window assemblies.

Utilities

Focusing on ember-resistant venting, roof-edge detailing, and window assemblies.

Project Overlays

Addressing the critical first five feet and near-home combustible reduction.

Project Overlays

Addressing the critical first five feet and near-home combustible reduction.

Budget Priorities

Navigating local permitting and strictly code-aware material selection.

Budget Priorities

Navigating local permitting and strictly code-aware material selection.

CONSTRUCTION + BUILDING SYSTEMS

Construction and Building-System Strategy

Custom design does not mean uncontrolled complexity. The strongest process establishes a clear program, target budget, approval path, and decision schedule before detailed design. Builtech compares structural systems and envelope strategies based on project goals, then coordinates architecture and engineering so the drawings are both buildable and permit-ready.

Conceptual building-system strategy for a custom ADU.
Conceptual building-system strategy for a custom ADU.

Project-Specific Options

Compare systems against the property, goals, and construction constraints rather than treating any method as a universal shortcut.

Coordinated Architecture + Engineering

Buildability + Permit Readiness

Decision Schedule

How Builtech Evaluates the Right Building System

Total Installed Cost

Compare the complete installed system cost, not only material pricing.

Site Access

Confirm that equipment, crews, and deliveries can reach the property safely and practically.

Structural Requirements

Match the approach to the site, design, engineering, and code requirements.

Energy Performance

Review insulation, air sealing, glazing, mechanical systems, and applicable energy requirements.

Fire Exposure

Evaluate exposure conditions and the project’s applicable fire-resilience requirements.

Moisture Management

Coordinate drainage, weather protection, wall assemblies, and durable transitions.

Trade Availability

Confirm qualified labor and specialty trades can support the selected approach.

Permitting

Evaluate integration with required documentation and agency review.

Schedule

Plan lead times, sequencing, inspections, and site logistics.

Long-Term Maintenance

Consider serviceability, finishes, durability, and owner expectations.

PERMITS + COORDINATION

Permitting, Utilities, and Code Coordination

The permit team develops the design within statewide ADU protections while checking the jurisdiction’s objective standards and project-specific overlays. Custom features that affect height, grading, retaining walls, fire access, drainage, utility service, or coastal review should be identified before the design becomes difficult to change.

Design Coordination

Develop a coordinated architectural set that responds to the property and the owner’s priorities.

Engineering Integration

Align structure, site work, and supporting consultants with the selected design path.

Energy + Building Systems

Coordinate the envelope, mechanical, electrical, plumbing, and applicable energy documentation.

Utility Planning

Evaluate service capacity, practical routing, and utility-provider requirements.

Fire + Site Review

Identify fire access, grading, drainage, and other project-specific conditions early.

Agency Comments

Manage applicable review comments while keeping the package coordinated.

BUDGET + SCHEDULE

What Drives Custom ADU Cost and Schedule?

What Drives Custom ADU Cost and Schedule?

A reliable budget is based on the property and scope—not a headline price per square foot. After the preferred concept is selected, Builtech develops a category-based budget and milestone schedule that identifies included scope, allowances, owner purchases, exclusions, contingency, utility responsibilities, and decisions required before construction.

Conceptual planning image for custom ADU budget and schedule decisions.
Conceptual planning image for custom ADU budget and schedule decisions.

Customization + Consultants

Focusing on ember-resistant venting, roof-edge detailing, and window assemblies.

Customization + Consultants

Focusing on ember-resistant venting, roof-edge detailing, and window assemblies.

Access + Site Work

Addressing the critical first five feet and near-home combustible reduction.

Access + Site Work

Addressing the critical first five feet and near-home combustible reduction.

Structural + Envelope Strategy

Navigating local permitting and strictly code-aware material selection.

Structural + Envelope Strategy

Navigating local permitting and strictly code-aware material selection.

Architecture + Specialty Finishes

Focusing on ember-resistant venting, roof-edge detailing, and window assemblies.

Architecture + Specialty Finishes

Focusing on ember-resistant venting, roof-edge detailing, and window assemblies.

Accessibility + Equipment

Addressing the critical first five feet and near-home combustible reduction.

Accessibility + Equipment

Addressing the critical first five feet and near-home combustible reduction.

Agency Reviews

Navigating local permitting and strictly code-aware material selection.

Agency Reviews

Navigating local permitting and strictly code-aware material selection.

RELATED ADU SERVICES

Explore More Ways Builtech Can Help

Explore More Ways Builtech Can Help

Explore the ADU feasibility study, California ADU cost guide, ADU process, and frequently asked questions to prepare for a custom ADU project.

Explore the ADU feasibility study, California ADU cost guide, ADU process, and frequently asked questions to prepare for a custom ADU project.

Conceptual evening exterior of a custom ADU in California.
Conceptual evening exterior of a custom ADU in California.

START WITH YOUR PROPERTY

Find Out What Your Property Can Support

Tell Builtech about your property, goals, intended ADU use, preferred project approach, budget range, and timing. The first conversation will identify the information needed to evaluate feasibility and define the most useful next step.

CUSTOM ADU FAQs

Frequently Asked Questions About Custom ADUs

Get answers to common questions about site-specific ADU design, preapproved plans, budget discipline, accessibility, and architectural fit.

When is a custom ADU better than a preapproved plan?

Custom design is often better when site constraints, household needs, architecture, accessibility, or construction methods cannot be handled well by a standard plan. A preapproved plan may be more efficient on a straightforward site if it still fits the owner’s goals.

When is a custom ADU better than a preapproved plan?

Can we start with a standard plan and customize it?

How do you keep a custom ADU within budget?

Can a custom ADU be designed for aging in place?

Can Builtech match the main house?

What does Builtech review during a custom ADU feasibility study?

How are permits handled for a custom ADU?

Can a custom ADU use specialized construction methods?

What affects the cost of a custom ADU?

What happens after I request an ADU feasibility review?